o poured 78 cubic feet of concrete while ensuring seamless electric and plumbing cutover, renewed main gate entry
o provided exceptional runway repairs critical to over 1,00 takeoffs and landings of the C-130s and numerous civilian aircraft assigned
o placed and secured 178 security barriers, increased security for over 10,000 Soldiers and allowed relaxed security posture inside compound
o assisted EOD with self-help project; moved 20 tons of earth and concrete, ensured on-schedule continuation of draw down
o engineered provisional runway which allowed initial air delivery of critical supplies and fuel
o repaired over 500 square feet of damaged airfield pavement; enabled delivery of essential supplies to awaiting forces in deployed locations
o identified and swiftly repaired twelve damaged runway areas, minimizing mission delays
o oversaw RED HORSE project progress and through meticulous attention to detail, predicted future equipment requirements and requisitioned D7 dozers and excavators, all arriving in time to keep project on schedule
o dependable team member; volunteered for details when no else would: fuel detail, water detail and latrine detail
o contributed to the effectiveness and success of projects Triad TOC and Motorpool 22, while operating and maintaining over $500,000 worth of equipment and material
o contributed to the Platoon's success in airfield site operations during SP245 and SP078 projects
o provided over 200 hours on dozers, graders, scrapers and the HYEX, BHL and bomag during Fort Riley Airfield project
o cleared and grubbed over 100 meters of trees and shrubs and laid over 200 meters of concertina wire and pickets
o supervised the mixing of 30,000 pounds of concrete and the completion of 4 drainage ditches