Thanks for your contributions!
We need more examples. Examples can be contributed by using the form below.
o supervised Forward Operating Base Salerno Runway Maintenance; attention to detail and foresight ensured FOB Salerno's runway was safe for hundreds of landings
o coordinated the construction of 150 yard concrete pedestal for C-Ram and a 28' x 60' Combative SWA Hut; improved base security with the elevation of the C-Ram
o served as crew leader for installing a 175 foot concrete sidewalk; enhanced comfort and convenience by accomodating daily foot traffic outside of J1
o installed utility system for $850K Bagram Theater Internment Facility (BTIF) project; exceeded drainage/slope specs, saved $5,000 in labor costs
o coordinated carpentry and masonry shop efforts to construct interior of $800K+ BTIF project; minimized delays of #1 mission priority
o supervised the expansion of the base ATG Syria; completed multiple missions simultaneously; poised for increased operations
o demonstrated superior knowledge of countermobilty obstacles; constructed 2200 meters of Hesco wall in less than 30 days
o established a company command post which facilitated oversight of training and construction project metrics across the entire Task Force
o ensured continued mission accomplishment by this diverse company and its consolidated dining facility
o OVERSAW THE EXECUTION OF $165 MILLION WORTH OF CONSTRUCTION, BUILDING OVER 140 AFGHAN NATIONAL SECURITY FORCES FACILITIES
o headed the advance party to Camp Dodge and established and secured barracks, drew linen, inventoried and assigned vehicles, and conducted range reconnaisance
o provided relevant and well-placed physical security technical advice gained from his international port facility security audit experience
o maintained high standards of the JTF Engineering shop while performing the duties of the Engineering Deputy Director
o assumed responsibility for all facility construction oversight and repair management
o assumed the lease after the Battalion went throught a life cycle replacement of IT systems; successfully recycled over $50,000 of superfluous computer systems at DRMO
o cleared 39 potentially hazardous obstacles; ensured safe convoy route for 113 tactical convoys on route Victor
o assisted interior electric shop with expedient install of 1800 feet of power wire; completed 14 days ahead of schedule, expanded light coverage
o erected two 2.2K square foot ABM facilities at Pope AFB; placed 330 cubic yards of concrete; secured $10M training asset
o oversaw the successful clean up of TA 206B; completed critical V-ditch mission 30 days ahead of schedule
o supervised ARTEP, CPX, and an eleven month construction project; mitigated risks, delivered projects with zero injuries, a unit first
o currently works with Pre-Mobilization Training and Assistance Team (PTAT)
o keeps his Soldiers informed of missions throughout the month before drill
o taught wrecker class how to increase recovery capability of the consolidated maintenance team
o secured the personal identifiable information for each device being sent to DRMO ensuring no loss of private information to the public
o supervised facility services for over 900,000 sq ft of JTF property