15B Aircraft Powerplant Repairer NCOER Bullets

Soldier repairing a helicopter engine

o his knowledge and experience with helicopter engine maintenance was vital to the success of C Co 1204th ASB

o ensured deadlines were met ahead of schedule and was key to the accomplishment of the GSAB mission in Operation New Dawn and Kuwait support

o ensured mission success by meticulous and diligent attention to detail required for the Downed Aircraft Recovery Team (DART)

o his skill at maintaining aircraft and directing repairs generated an unprecedented rate of readiness


Production Control NCOIC

o prioritized 1-52D Aviation Regiment maintenance; focused efforts and resources to meet all mission requirements on time and ensure the success of the Brigade

o managed and exploited the capabilities of the Unit Level Logistics System-Aviation (Enhanced) system (ULLSA-E) and reduced maintenance delays by 30%



o ensured the safe movement of personnel and over $10 million worth of equipment accident free during last deployment

o focused maintainer; identified broken engine augmenter bell crank, prevented aircraft damage and engine failure

o contributed to the unit's success during four tours deployed overseas while assigned to 10th Combat Aviation Brigade

o maintained 7 OH-58D and performed phase maintenance on the AH-64 in support of B Co 277 Aviation Support Battalion

o troubleshot inoperative generator control unit prior to launch; removed/replaced unit and ensured on-time takeoff

o led 13 Soldiers in testing/troubleshooting of 120 engines; 36 units returned to service in less than 30 days; enabled 12,000 flying hours

o identified aircraft hydraulic leak; replaced defective hydraulic start motor, averted system failure and over $100,000 in repairs


To contribute examples, use this form.

Duty Title

Bullet Comments